HONGYANG GROUP Honduras Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Honduras Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

D-G22 FUEL DISPENSER

D-G22

D-G22 FUEL DISPENSER

Pump Type :Optional

Inlet Pressure: >=54kPa.

Flow rate (L/min.): 55±5

Suction Distance (m): 6(verticalmente) / 50(orizzontalmente)

FlowMeter Type : Optional

Accuracy :±0.2%

Motor Voltage(V): 110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle : Auto Shut-off Nozzle

Environmental Condition : -40~~+55degree

Control Type : Solenold Vale Control Type

Preset: Function Provided(Small LCDIndicator)

Display(Counter): Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Optional Display Type: LCD and Bright Backlight

Digit of Volume : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price :0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Totalizer :1~~9,999,999

Hose :4.5m

Weight : 235kg

Dimension(L×W×H): 900*620*2180(mm)

Dimension(L×W×H)Of Qty of Container :40ft: 45 20ft: 22

products links

links

technical archives

    . Examine clearance and replace relevant components when necessary. 1.4. Measurement transducer block 1.5. No discharge due to Solenoid valve closed. First check electric wiring, then trouble on component itself (short circuit of winding or block in valve membrane, etc). 1.6. Pipeline and bottom valve failure If continuously exhaust in vapor separator from beginning, disconnect filter cover and take out filter net; pour same kind of oil in it and given see oil level quickly drop, there is leakage occurred in pipeline and bottom valve. 1.7. No discharge caused by nozzle failure Jam in jointer or filter. Unlock strainer or jointer to remove dirt and waste. Nozzle always in auto-shut state, check automatic shut device, mainly inlet vent, spring. 1.8. Bottom valve be stuck in and pipeline is plugged. Exterior reasons for no delivery Oil level is so lower than bottom valve that pump can’t suck oil. Some valve(s) is closed in pipeline between tank and fuel dispensers. Air goes into valve(s). Single phase valve is fuel dispenser rusted in bottom valve. Incorrect installation of flange causes leakage between inlet pipe and fuel dispenser. Inappropriate oil is refueled. Oil is easy to gasify; water in oil freeze; wax in oil plug pipe. Pipe design is unsuitable. Two fuel dispensers, for example, are connected in same pipeline without valve, or valve can’t shut completely; pipeline has many crooks or too thin. Slow flow rate as starting 3.1. Strainers, including cone-shaped filter net and nozzle filter net, are jammed. 3.2. Large amount of air flow into from broken parts or pipeline, causing much foam in oil indicator. 3.3. Large noise and vibration during operation Vacuum pressure is inadequate. Leakage occurs in overflow valve or pump gasket. Inner leakage in fuel dispenser increase as serious abrasion in pump vane or vane is stuck by waste. Vapor separator trouble Small floater of vapor separator is broken or fall down; insufficient pressure in high pressure chamber as exhausting valve can fuel dispenser fuel dispenser

technical specification

    les shall be used for each solvent.   The total exposure time shall be made up of one period of (66 ?2) h and seven periods of (17 ?1) h in this order.   Each exposure period shall be followed by a drying period where the sample is removed from the solvent vapour   and is subjected to forced draft ventilation in fresh air for a minimum period of 6 h.   Inspect the cable and record findings.   30       6.1.4.3 Impact test   Within one hour of the completion of the (66 ?2) h period solvent test the sample shall be positioned on the steel   base of the apparatus shown in Figure 7 and underneath the hardened steel intermediate piece.   Key   1 Hammer   2 Hardened steel   3 Sample   Figure 7 Test set-up for the impact test   A ham fuel dispenser mer with a mass of 1kg shall be caused to fall onto the hardened steel intermediate piece through a height of   h = 0 5 m. The sample shall be removed from the apparatus.   Examine sample under a magnification of 10 and record findings.   +5   A test voltage in accordance with Table 2 a) or Table 2 b) shall be applied for (60 0 ) s between each conductor in   turn and the remaining conductor or the remaining conductors connected together.   Verify if the sample withstands the voltage test and there is no breakdown of the applied voltage record results.   -- - - ---   fuel dispenser fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    e as soon as possible, even though it costs around £20,000 a year to treat one patient. The campaign paid off politically. Despite the lack of any guidance from NICE, Patricia Hewitt, the health secretary, said in October that PCTs should not refuse to fund Herceptin solely on the grounds of cost. That in turn has led some to finance the drug, while it remains unavailable in other parts of the country. The good news is that this unhappy situation, which has led to charges of political interference, will be resolved later this year. Now that Roche has applied for a licence, which EMEA should deal with in two to three months, NICE expects to be able to issue guidance in August. The new “fast-track?procedure under which NICE will consider Herceptin is a response to criticism that it takes too long to issue guidance on new drugs. At present, its appraisals take on average 14-15 months. One reason why the process is often protracted is that NICE usually has to compare more than one drug. When considering a single medi fuel dispenser cine like Herceptin, the evaluation can be much quicker. But if NICE provides faster and generally favourable guidance on new drugs, that will intensify the financial pressure on the NHS. Julian Le Grand, a former health-policy adviser to Tony Blair, says that NICE evaluations do not consider their overall affordability “They don t take into account what the new drug might displace? The row over Herceptin may be a foretaste of what is to come. With information about new drugs now disseminated so swiftly, the pressure from patients to get them quickly can only grow. That will make dispassionate decisions to ensure value for money even more important. © 2006 . About sponsorship Anglican investment Holier than thou Feb 23rd 2006 From The Economist print edition The West Bank divides Britain s Anglicans and Jews Get article background IF THERE is one thing at which English churchmen ha fuel dispenser fuel dispenser