HONGYANG GROUP Honduras Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Honduras Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

U312 Automatic Nozzle

U312

U312 Automatic Nozzle

U312 series automatic nozzles are designed with today's customer in mind. Small, trim, light weight, easy and convenient to operate, the is a rugged performer that offers long life and reliable service.

Warning

Use foreign objects to hold open automatic nozzles could result in failure to shut-off and personal injury.

Materials:

Body: Aluminum

seals: Buna-N, Viton

Main stem seals: Viton Cased Oil Seal / Graphite with Teflon

Main stem: Stainless steel

Color of insulator :

Red Green Blue Yellow Black

Features :

U312-B/D/F Flow rate: 0-60 L/m (15/16")

U312-A/C/E Flow rate: 0-45 L/m (13/16")

Working Pressure: 0.18Mpa

U312 Automatic Nozzles-or diesel, kerosene and all kinds of gasoline service

Easily replaced spout- simply remove the screw.

Spout kits are available from HONGYANG.

Low profile aluminum body- light weight, easier to handle, provides an attractive, image enhancing appearance.

Hold-open rack is available for full service applications.

The one hand control means easy setting to flow rate for customer's convenience.

Full hand insulator- protects both nozzle and vehicle, and insulates users' hands.

Vacuum Design: Side-Sealing Design.

Selective casting process of body- low-pressure casting technique or high-pressure casting technique.

The high-pressure casting technique can reduce diesel foaming and static electricity.

100% Factory Tested.

Available Colors- color chart on inside back cover Selective splash guard.

Replacement Parts:

Key Description

1 Spout 13/16" & Spout 15/16"

2 Full hand insulator

3 Main Valve Assembly

4 Lever

5 Ratchet Pin

6 Diaphragm assembly

Package:

Net Weight Cross Weight Dimension

18.75kg/case of 15

12.25kg/case of 10 22kg/case of 15

15kg/case of 10 55x34x42.5cm/case of 15

37.5x34x43cm/case of 10

Important:

The products should be used in compliance with applicable country, province and local Laws and regulations. Products selection should be based on physical Specifications and limitations and compatibility with the environmentand materials to be handled. HONGYANG makes no warranty of fitness for a particular use. All illustrations and Specifications in this literature are based on the latest products information available at the time of publication,HONGYANG reserves the right to make changes at any time in price, materials. Specifications and models and to discontinue models without notice or obligation.

products links

links

technical archives

    result during approval progress. The other is to make adjustment as temperature fluctuate 20 degree. Stopwatch, minimum value 0.1 second, is used for measuring how long a certain volume medium discharge out of fuel dispenser so as to calculate its flow rate. Gradienter, precision being 0.05mm/m, measures the degree of level. Article III Indicating appraisal method and data processing Appraisal of fuel dispenser actually is an indicating access. Presently, cubage compare method is mostly used defining basic tolerance between the volumes flow over flow meter and in metal standard measurer. Diagram 6-2 is illustrated the fuel dispenser’s appraisal flow. 1: Check fuel dis fuel dispenser penser valve 2: Pump 3: Vapor separator 4: Flow meter 5: Indicating device 6: Hose 7: Nozzle 8: Standard measurer 9: Measurer 10: Switch & zeroing 11: Container 12: Motor 13: Tank 14: Filter net Diagram 6-2: Appraisal of fuel dispenser using metal standard measurer Preparation before appraisal Place metal standard measurer on the hard ground and adjust with gradienter. It also put on fuel dispenser vehicle or other bracket, as long as not waving or vibration during appraisal progress. Metal standard measurer should be earthing- connected. It is suggested to connect the measurer to ground terminal of fuel dispenser, making them being same potential. Running-in and wet measurer. Putting indicator device at zero, open nozzle and observe oil indicator. Oil is transparent as there is no foam in it. If have foam or bubble oil would be feculent and opaque. If foam exists in oil for a long time, fuel dispenser would have trouble. Appraise again after solving failure. Close nozzle as measurer full of oil. Empty measurer in accordance with relative method and time, and shut off bottom valve, putting measurer in preparation state. Appraisal procedure of indicating valve Set unit price; Adjust flow to the maximum Qmax; Wet measurer and place it according to regulation; Tune indicator finger to zero position; Infuse measurer as preset volume, measure outlet t

technical specification

    ......... 61   11.6.8. Message 8 (R ponse d autorisation)............................................................................... 61   11.6.9. Message 9 (Demande d enregistrement de transaction) ................................................ 62   11.6.10. Message 10 (Compte-rendu d enregistrement transaction)........................................ 63   11.7. MESSAGES APPLICATIFS CARTES A PISTE ...................................................................... 64   11.7.1. Message 1 (Demande de param ╰res)............................................................................ 64   11.7.2. Message 2 (r ponse ? fuel dis fuel dispenser penser la demande de param ╰res) ....................................................... 64   11.7.3. Message 3 (Ouverture de transaction demande de validit carte) ............................... 65   11.7.4. Message 4 (R ponse ouverture de transaction validit carte)...................................... 65   11.7.5. Message 5 (Demande contr 磍e de code) ............. fuel dispenser ........................................................... 66   11.7.6. Message 6 (R ponse contr 磍e de code) ......................................................................... 66   11.7.7. Message 7 (D clenchement de demande dautorisation) ............................................... 66   11.7.8. Message 8 (R ponse dautorisation)............................................................................... 66   11.7.9. Message 9 (Demande denregistrement transaction) ..................................................... 67   11.7.10. Message 10 (R ponse d enregistrement de transaction) ........................................... 67   11.8. ASPECTS COMMUNS A TOUS LES APPLICATIFS .......................................................................... 68   11.8.1. Caract ristiques des textes transmis par la mon tique .................................................. 68 

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    the new labour-market controls will turn out to be. Bulgarians and Romanians will still be allowed to visit Britain. The government cannot prevent them from working if they are self-employed. The figures for migration from the first eight countries in eastern Europe show that this could prove a significant chink in the door. Those working illegally can be fined £1,000 ($1,876); and their employers £5,000. Mr Reid has also doubled the funding to enforce compliance. Whether these sanctions will bite is open to doubt given the difficulty of policing jobs. The Transport and General Workers Union fears that “rogue employers?will favour Bulgarians and Romanians be fuel dis fuel dispenser penser cause they will offer “scared, compliant labour?without any legal protection. Some may just declare themselves self-employed. The Bulgarian and Romanian governments are offended by the controls. Research from the Institute for Public Policy Research, a think-tank, suggests that most Bulgarians and Romanians would in any case rather work in Mediterranean countries where many of fuel dispenser their compatriots are already employed. The wave of migration from eastern Europe has been good for the economy. However, the government has been rattled by growing opposition to the newcomers. One concern is that they are out-competing native unskilled workers. Another is that they are putting excessive strain on the public services. Politics has trumped economics. © 2006 . About sponsorship Electricity grid Big spender Oct 26th 2006 From The Economist print edition The rise of renewables will change the power network HIGH oil and gas prices, together with worries about both energy security and climate change, are reshaping the power industry. There are high hopes that new technologies for generating electricity will be able to reduce dependence on fossil fuels. Less attention is paid to the transmission network that links consumers with power plan